Installation,
executed by
specialists
We deploy automation hardware on behalf of integrators and OEMs across the EU - from single conveyor lines to full ASRS, AGV and sortation systems. Trained crews, controlled documentation, on-spec handover.
Approach to delivery.
Our installation specialists follow a methodology that addresses every critical phase of system deployment - from initial site inspection through final integration. We execute with precision so integrators close their projects flawlessly, from day one.
Site assessment
Our team visits the facility, captures levelling, clearances, civil tolerances and infrastructure dependencies before any hardware ships. We translate findings into a deployment dossier the integrator can rely on.
- Floor survey & flatness
- Power & pneumatic audit
- Network topology check
- Risk & permit register
Dossier · Risks
Precision installation
Mechanical, electrical and controls work executed by trained crews against the integrator’s drawings. Every element levelled, fastened and routed to spec, with photo-documented progress and end-of-shift hand-back.
- Mechanical assembly
- Electrical & controls wiring
- Conveyor & rack alignment
- As-built photo log
As-built · QC log
System integration
Subsystems brought online together. We coordinate with controls and software teams, execute supplier acceptance tests, and hand the line over against the integrator’s commissioning checklist - clean and on time.
- Subsystem run-up
- SAT support & sign-off
- Punch-list closeout
- Handover dossier
SAT · Handover
System types we install.
Why quality matters.
Properly installed automation systems perform at peak efficiency, require fewer maintenance interventions, and deliver the operating economics the integrator promised the customer. Installation errors compound - they cause throughput losses, premature wear and recurring downtime that erodes margin across the lifetime of the asset.
Installation issues are responsible for nearly half of automation project delivery problems we are asked to recover. Most are preventable: floor flatness out of spec, mechanical tolerances stacked, cable routing improvised, sign-off skipped under schedule pressure.
Our crews execute against a written installation method statement - the same document we hand over with the system. There is no improvisation in the field, because the field is where defects get baked in. Every fastener, every alignment, every continuity test gets logged.
For integrators, the result is closeout without surprises: zero punch-list rework after SAT, full as-built documentation in the bid pack format you specified, and a system that performs to the curve you sold.
Installation process - questions.
Your installation.
Our crew. On schedule.
Real-time project tracking, detailed documentation, and dedicated specialists who work as an extension of your delivery team - for one line or a multi-cell programme.