SPEC · V.2026.Q2 [email protected] EU-WIDE · 24/7
- N° 02 / 05 · IndustryOEM Tier-1 & Tier-2SCOPE EU-wide

E-commerce
fulfilment,
peak-ready

Mega-fulfilment centres engineered for peak - installed, commissioned and stress-tested before launch. Goods-to-person, sortation, robotics and returns flow into one cooperating system.

PEAK READINESS
99.9%
Uptime SLA across peak-week operations.
SORT ACCURACY
99.95%
Sortation accuracy across deployed cross-belt fleets.
PROJECTS
52+
E-commerce DCs commissioned
- N° 02 / 05
Sector context

Sector context.

Peak is not a stress test - it is the test the customer paid for.
- Operations doctrine · MERIXA e-commerce crew

E-commerce DCs live or die in peak week. Throughput targets that look comfortable in spec quietly fail when the picker workflow, the sorter induction and the returns flow all hit their limits at the same time. Installation discipline is the only thing that keeps that from being your problem.

We commission mega-fulfilment with peak-test scripts that exercise the line at design throughput plus 20% - surfacing exception handling, recovery cycles and recovery time objectives that paper-only specifications miss.

For integrators serving high-velocity 3PL and direct-to-consumer customers, the brand cost of a launch that drifts under load is real. We hand the line over with documentation that proves it ran clean before the customer’s ops team took it.

And in the lull after launch, our maintenance practice keeps the asset reliable into the next peak - single-vendor coverage across multi-site networks.

- N° 03 / 05
Performance

Key performance metrics.

PEAK UPTIME
99.9%
Availability across peak weeks for deployed DCs.
[ AVAIL-PEAK ]
SORT ACCURACY
99.95%
Cross-belt and tilt-tray sortation accuracy verified at SAT.
[ SORT-FY ]
INDUCT THROUGHPUT
+30%
Induction rate gain post-commissioning vs as-installed baseline.
[ INDUCT-DELTA ]
RETURNS CYCLE
−40%
Cycle-time reduction in returns processing post-deployment.
[ RET-CYCLE ]
- N° 04 / 05
What we install

Solutions, end to end.

Sector requirements we engineer to

  • REQ.01Peak-week throughput targets validated under stress-test
  • REQ.02Goods-to-person workflow ergonomics & pick-rate verification
  • REQ.03Sortation accuracy and induct-divert reliability
  • REQ.04Robotics integration - pocket sorter, AMR, robotic pick
  • REQ.05Returns flow with grade/repair/restock automation
  • REQ.06Brownfield expansion windows aligned to peak calendar

Solutions we install & support

  • SOL.01Goods-to-person stations - install & commissioning - operator workflow validation and HMI signal-quality test
  • SOL.02Pocket sortation systems - induct, sort, sequence and consolidate against retailer cut-off windows
  • SOL.03Tilt-tray & cross-belt sortation - install, alignment and sortation accuracy verification
  • SOL.04Robotic pick & AMR fleet integration - traffic management, charging-bay and safety-zone commissioning
  • SOL.05Returns processing automation - grade / repair / restock flow design and install
  • SOL.06Peak-readiness stress test & soak - exercise the line at design + 20% before customer hand-over
- N° 05 / 05
Capabilities

Systems we install for e-commerce.

System
Scope of works
Typical tags
01
Goods-to-person stations
install & commissioning
02
Pocket sortation systems
induct, sort, sequence and consolidate against retailer cut-off windows
03
Tilt-tray & cross-belt sortation
install, alignment and sortation accuracy verification
04
Robotic pick & AMR fleet integration
traffic management, charging-bay and safety-zone commissioning
- Engage

Built for peak.
Soaked before launch.

Mega-fulfilment install, commissioning and stress-test - handed over with the documentation to prove it.