Capabilities,
end to end

Five disciplines, one accountable team. From initial site assessment to post-go-live support, all delivered to integrator drawings, on integrator timelines, against a written method statement.

- N° 01 / 03
Capabilities

Setting the standard in EU intralogistics installation.

- N° 02 / 03
Why MERIXA

Six reasons integrators keep coming back.

What you get from us

  • A.01Written method statement before the first fastener turns. The integrator and the customer sign the same document.
  • A.02EU-wide field crew with mobilisation in 72 hours, no minimum-volume lock-in.
  • A.03Photo-documented QC log per shift, audited at SAT, handed over as the as-built dossier.
  • A.04Single-vendor coverage for multi-site programmes. One PPM cadence, one parts pool, one report.
  • A.05Integrator-native reporting: we embed inside your Smartsheet, Jira, MS Project or whatever you run.
  • A.06ISO 9001:2015, ISO 45001, SCC** and VCA** certifications across the field organisation.

How we differ

  • B.01Built around installation execution, not consulting layered on top. The PMO has run installation crews.
  • B.02Brownfield is a core competency, not an exception. Night-shift, weekend and rolling-bay programmes are standard.
  • B.03Vendor-agnostic. We install and maintain hardware regardless of who originally signed the contract.
  • B.04Recovery and turnaround engagements are an explicit competency, not just greenfield work.
  • B.05Diagnostic-first emergency response. The cause gets a written RCA before parts swap.
  • B.06No phone numbers on the website by design. Documented inquiry channels, response within four business hours.
- N° 03 / 03
When to engage

Five moments we add the most value.

SCOPE FREEZE
Wk -8
Eight weeks before mobilisation, when the bid pack is firming up and the integrator wants the field perspective baked in.
[ ENG-01 ]
PRE-MOBILISATION
Wk -2
Two weeks before the crew lands, when site assessment, permits and risk register need to be written.
[ ENG-02 ]
RECOVERY
Wk N
When the original installer is behind, defects are accumulating and the SAT calendar is at risk.
[ ENG-03 ]
POST-LAUNCH
Wk N+4
After the line is live and the customer wants single-vendor maintenance with EU-wide 24/7 mobilisation.
[ ENG-04 ]

Most integrators engage us at scope-freeze for greenfield programmes and at week N for recovery work. Both routes start the same way: a written brief, a costed plan, and a Gantt that synchronises with your steering committee. We do not bill against vague scope, and we do not pitch with names of integrators we have not closed projects for.

- N° 04 / 04 · Engage

One vendor, every phase.

Engage MERIXA on a single line, a multi-site programme, or anywhere in between. We mobilise specialists in days, not months, against your calendar.