Capabilities,
end to end
Five disciplines, one accountable team. From initial site assessment to post-go-live support, all delivered to integrator drawings, on integrator timelines, against a written method statement.
Setting the standard in EU intralogistics installation.
01
Installation
Mechanical assembly, electrical termination and structural integration of conveyors, sorters, AS/RS, AGVs and shuttle systems, to integrator drawings, on integrator timelines.
02
Commissioning
Throughput validation, control-loop tuning and SAT execution, until the line clears acceptance criteria with full documentation and integrator sign-off.
03
Maintenance
Preventive maintenance, condition-based monitoring and 24/7 emergency response, SLA-backed across the EU. Single-vendor coverage for multi-site portfolios.
04
Upgrades
Capacity expansion, controls modernisation and obsolescence remediation, installed inside live operations with disciplined sequencing and fall-back procedures.
05
Project Mgmt
Integrator-aligned project leadership: planning, scheduling, risk register and reporting layer that audits cleanly into your delivery dashboards.
Six reasons integrators keep coming back.
What you get from us
- A.01Written method statement before the first fastener turns. The integrator and the customer sign the same document.
- A.02EU-wide field crew with mobilisation in 72 hours, no minimum-volume lock-in.
- A.03Photo-documented QC log per shift, audited at SAT, handed over as the as-built dossier.
- A.04Single-vendor coverage for multi-site programmes. One PPM cadence, one parts pool, one report.
- A.05Integrator-native reporting: we embed inside your Smartsheet, Jira, MS Project or whatever you run.
- A.06ISO 9001:2015, ISO 45001, SCC** and VCA** certifications across the field organisation.
How we differ
- B.01Built around installation execution, not consulting layered on top. The PMO has run installation crews.
- B.02Brownfield is a core competency, not an exception. Night-shift, weekend and rolling-bay programmes are standard.
- B.03Vendor-agnostic. We install and maintain hardware regardless of who originally signed the contract.
- B.04Recovery and turnaround engagements are an explicit competency, not just greenfield work.
- B.05Diagnostic-first emergency response. The cause gets a written RCA before parts swap.
- B.06No phone numbers on the website by design. Documented inquiry channels, response within four business hours.
Five moments we add the most value.
SCOPE FREEZE
Wk -8
Eight weeks before mobilisation, when the bid pack is firming up and the integrator wants the field perspective baked in.
[ ENG-01 ]
PRE-MOBILISATION
Wk -2
Two weeks before the crew lands, when site assessment, permits and risk register need to be written.
[ ENG-02 ]
RECOVERY
Wk N
When the original installer is behind, defects are accumulating and the SAT calendar is at risk.
[ ENG-03 ]
POST-LAUNCH
Wk N+4
After the line is live and the customer wants single-vendor maintenance with EU-wide 24/7 mobilisation.
[ ENG-04 ]
Most integrators engage us at scope-freeze for greenfield programmes and at week N for recovery work. Both routes start the same way: a written brief, a costed plan, and a Gantt that synchronises with your steering committee. We do not bill against vague scope, and we do not pitch with names of integrators we have not closed projects for.
- N° 04 / 04 · Engage
One vendor, every phase.
Engage MERIXA on a single line, a multi-site programme, or anywhere in between. We mobilise specialists in days, not months, against your calendar.