Build the
installation
practice
MERIXA hires field specialists, foremen, project managers and QA officers. The work is technical, the standards are written, and the crews own their scope. If you finish the punch list before SAT, we will probably get along.
Three reasons our people stay.
What you get
- A.01Disciplined teams that arrive prepared and leave with the QC log signed.
- A.02Travel across the EU on real automation projects, not isolated callouts.
- A.03Written method statements - you know what good looks like before you start.
- A.04Tier-1 OEM training certifications across major ASRS, conveyor and AGV platforms.
- A.05Career path from installer → foreman → project lead, transparent and earned.
- A.06Compensation indexed to country & site. Per-diems, travel, gear - fully covered.
What we expect
- B.01Technical literacy - drawings, schematics, control layers, network topology.
- B.02Field discipline - the method statement is the contract.
- B.03Safety-first behaviour, every shift, no exceptions.
- B.04EU travel - mobilisation in days, not months.
- B.05English working language for crew briefings & integrator interface.
- B.06Documentation rigour - if it is not logged, it did not happen.
Field, foreman, PMO.
N°
Role
Brief
Location · team
01
Mechanical installerField · M
Lead mechanical installation on conveyor, AS/RS and sortation systems. Read drawings, level frames, fasten to spec, photo-document the QC log.
02
Electrical installerField · E
Cable routing, termination and continuity testing. Work to integrator schematics across automotive, e-com, manufacturing and retail sites.
03
Controls technicianField · C
PLC integration, sensor commissioning and SAT support. Coordinate with integrator software teams during line bring-up.
04
Field foreman / leadField · L
Run a site crew of 3-12 specialists. Own daily QC log, end-of-shift hand-back, and integrator interface.
05
Project managerPMO
Plan, schedule and report on multi-site programmes. Build the Gantt at scope-freeze and update it weekly with integrator counterpart.
06
QA / safety officerField · QA
Audit method-statement compliance on site. Maintain the QC dossier integrators sign off at SAT.
- Apply
Send a CV.
One business day.
No application portal, no automated reply queue. Send a short CV and a one-paragraph note about a project you closed cleanly - we read everything.